|
|
|
 |
|
Drilling and Well Completion |
Page: 4/4 | |
|
|
|
Rental Of Drilling Equipment
- Drillpipe – sizes ranging from 2-7/8” OD to 5-7/8” OD
- Drill Collars – sizes ranging from 3-1/8” OD to 9-1/2” OD
- Heviwate Drillpipe – sizes ranging from 3-1/2” OD to 6-5/8” OD
- Tubing – sizes ranging from 1.66” OD to 5” OD
- Handling Tools – elevators, slips, tongs, clamps, etc
- Ancillary Tools – kelly valves, inside BOP valves, crossover subs, casing scrapers, etc
- Blow Out Preventors – annular and ram type
- Pressure Control Equipment – valves, rams, adaptors, koomey units, manifolds, etc
|
|
|
|
|
|